In addition, a number of processes lack integration

Description of your first forum.
Post Reply
[email protected]
Posts: 45
Joined: Tue Jan 07, 2025 4:50 am

In addition, a number of processes lack integration

Post by [email protected] »

.
For example, public hearings and discussions of territorial development plans have long been transferred to digital form, to the POS platform, but are not integrated. Within the framework of the future unified service, it is necessary that the full cycle occurs within it and does not go beyond its framework, says Rodionova. There should be an ecosystem in which documents are accepted and decisions are made.

A mandatory element of the future service is integration with the National Social Data Protection System.

"Any documents on planning and other construction documentation must be transferred to the NSPD," explains Rodionova. "There must be a full set of data, this is a high-level system that estonia whatsapp number list identifies conflicts and contains the most accurate data. Thanks to this, the applicant will instantly receive reliable information online."
It is also planned to develop a mobile calendar (will ensure transparency and customer focus), a checklist in MP (will ensure a unified methodology) and a Unified Register of Violations and Instructions on the Gostech platform.

Artificial Intelligence and Help in Finding Construction Violations

As Andrey Borodkin, CEO of Tekhzor, explains, now a State Construction Supervision inspector arrives, records violations on paper or in messengers, then someone else will have to review them. It is unknown how much time will pass to eliminate the violations, plus there is also a corruption factor (“they lost the paper”).

It is proposed to make it so that the State Construction Supervision inspector would go out, record violations in the mobile application, and issue an order not only to the UKS (capital construction department), but also to the general contractor. At the same time, he should have a methodology for inspections (checklist): this will allow moving from subjective factors to objective ones and will not miss important violations. The application should have a scope of visibility (something is seen by the UKS, something by the general contractor).
Post Reply